SEZNAM SOUADNIC PODROBNCH BOD

k: Zemchy u Kralup nad Vltavou
okres: Mlnk

Sou.  systm  :  S-JTSK
Vk.  systm :  Bpv

.b    Y         X         Z       poznmka   
-------------------------------------------------------
1  751478.76 1025496.00  187.55    obruba dole
2  751478.80 1025496.01  187.67    obruba nahoe
3  751480.55 1025496.17  187.66    asfalt
4  751480.76 1025498.64  187.62    betonov sloup+lampa
5  751482.65 1025494.06  187.19    plot drtn
6  751478.60 1025501.55  187.48    pln ra
7  751475.63 1025495.81  187.59    osa komunikace
8  751472.70 1025496.92  187.53    pln ra
9  751472.47 1025496.89  187.53    silnice
10  751471.42 1025496.60  187.02    pkop
11  751470.40 1025497.02  187.90    horn_hrana_nlet
12  751471.76 1025493.44  187.60    dopravn znaka
13  751472.16 1025506.93  187.37    dopravn znaka
14  751481.39 1025506.48  187.24    stromek
15  751481.33 1025512.60  187.35    stromek
16  751481.41 1025518.54  187.19    stromek
17  751482.65 1025515.38  186.95    plot drtn25cm
18  751480.67 1025515.38  187.46    asfalt
19  751478.86 1025515.41  187.37    obruba dole
20  751475.62 1025515.67  187.31    osa komunikace
21  751472.87 1025515.87  187.27    pln ra
22  751472.50 1025515.90  187.25    silnice
23  751471.39 1025515.84  186.79    pkop
24  751470.82 1025515.93  187.38    horn_hrana_nlet
25  751472.42 1025525.42  187.29    dopravn znaka1.5m
26  751473.01 1025526.97  187.19    roura BE500-1.5m
27  751472.71 1025527.09  187.16    vjezd
28  751472.83 1025531.83  187.16    vjezd
29  751473.05 1025532.07  187.11    roura BE500-1.5m
30  751471.50 1025532.82  186.64    strom
31  751473.08 1025532.03  187.16    pln ra
32  751475.89 1025532.16  187.19    osa komunikace
33  751478.95 1025532.15  187.20    obruba dole
34  751481.57 1025530.48  187.26    stromek
35  751480.77 1025530.63  187.33    asfalt
36  751481.13 1025534.13  187.28    betonov sloup
37  751480.85 1025539.93  187.22    asfalt
38  751480.86 1025541.49  187.21    asfalt
39  751483.13 1025539.87  186.90    branka
40  751483.10 1025541.27  186.87    branka
41  751481.63 1025546.19  187.21    stromek
42  751481.74 1025552.31  187.19    stromek
43  751480.91 1025552.10  187.21    asfalt
44  751479.07 1025552.29  187.07    obruba dole
45  751478.81 1025551.91  187.05    vpus
46  751476.02 1025551.95  187.14    osa komunikace
47  751473.35 1025551.98  187.08    pln ra
48  751473.05 1025552.02  187.07    silnice
49  751471.37 1025551.44  186.51    pkop
50  751471.81 1025552.32  186.33    pkop
51  751470.65 1025551.59  186.73    horn_hrana
52  751481.71 1025556.92  187.20    stromek
53  751481.93 1025564.24  187.27    stromek
54  751482.03 1025573.24  187.29    stromek
55  751481.46 1025568.65  187.31    betonov sloup+lampa+znaka
56  751483.37 1025569.90  186.84    plot drtn
57  751481.02 1025569.69  187.33    asfalt
58  751479.21 1025569.66  187.22    obruba dole
59  751476.35 1025569.91  187.23    osa komunikace
60  751473.60 1025569.89  187.20    pln ra
61  751473.28 1025569.85  187.19    vjezd
62  751471.37 1025569.36  186.67    roura BE500
63  751472.58 1025569.54  187.05    horn_hrana
64  751470.21 1025569.96  186.98    horn_hrana
65  751470.07 1025575.11  186.94    horn_hrana_nlet
66  751472.43 1025574.98  187.17    horn_hrana
67  751471.00 1025574.97  186.77    roura BE500
68  751473.49 1025575.08  187.26    vjezd
69  751473.10 1025576.08  187.23    patnk
70  751473.03 1025579.51  187.26    patnk
71  751473.10 1025581.93  187.32    patnk
72  751473.18 1025585.34  187.38    patnk
73  751473.22 1025588.41  187.33    patnk
74  751472.81 1025580.68  187.06    ze nahoe
75  751472.61 1025580.77  186.67    ze dole
76  751472.68 1025587.22  186.39    ze dole
77  751472.80 1025588.56  187.26    ze nahoe
78  751472.57 1025582.39  186.62    potrub OCEL150
79  751472.49 1025590.83  186.40    potrub OCEL150
80  751473.58 1025588.35  187.43    silnice
81  751473.81 1025588.34  187.44    pln ra
82  751473.25 1025588.56  187.46    msa dole
83  751473.23 1025588.55  187.60    msa nahoe
84  751472.83 1025588.56  187.58    msa nahoe
85  751472.96 1025588.64  187.59    dopravn znaka
86  751473.01 1025588.60  188.83    zbradl
87  751475.90 1025588.23  187.45    osa komunikace
88  751479.30 1025584.97  187.38    obruba dole
89  751479.25 1025586.97  187.41    obruba dole
90  751478.80 1025588.92  187.44    obruba dole
91  751478.73 1025589.21  187.44    obruba dole
92  751479.10 1025587.94  187.53    obruba nahoe
93  751478.85 1025588.91  187.53    obruba nahoe
94  751479.16 1025582.99  187.35    pln ra
95  751478.98 1025586.24  187.39    pln ra
96  751478.62 1025588.70  187.44    pln ra
97  751478.51 1025590.14  187.45    pln ra
98  751481.14 1025584.22  187.44    asfalt
99  751481.04 1025587.02  187.44    asfalt
100  751480.67 1025589.34  187.51    asfalt
101  751481.30 1025587.97  187.41    dopravn znaka
102  751481.23 1025588.04  188.39    zbradl
103  751480.70 1025589.30  188.49    zbradl
104  751480.81 1025591.27  187.51    dopravn znaka_plot drtn
105  751481.16 1025590.20  187.18    potrub OCEL200
106  751481.01 1025590.29  187.22    potrub OCEL50-2x
107  751480.96 1025590.44  187.16    ze nahoe
108  751481.45 1025590.21  187.11    ze nahoe
109  751482.90 1025587.56  186.64    ze nahoe+dole
110  751483.36 1025586.46  186.72    plot drtn
111  751480.91 1025589.13  187.45    msa nahoe
112  751480.95 1025589.10  187.31    msa dole
113  751481.39 1025593.66  187.53    hlsi
114  751481.25 1025597.56  187.19    OCEL200
115  751481.09 1025597.76  187.32    OCEL50-2X
116  751481.14 1025597.65  187.19    ze nahoe
117  751481.78 1025597.45  187.19    ze nahoe
118  751480.91 1025597.21  187.51    plot drtn
119  751481.02 1025599.04  187.47    msa nahoe+dole
120  751480.91 1025599.06  188.52    zbradl
121  751481.44 1025600.36  188.47    zbradl
122  751480.76 1025598.90  187.53    asfalt
123  751481.25 1025601.58  187.44    asfalt
124  751481.86 1025602.03  187.29    betonov sloup_PRIS
125  751482.53 1025601.47  187.11    PRIS50
126  751482.47 1025600.53  187.10    PRIS50
127  751483.72 1025599.56  186.65    dlaba
128  751483.67 1025600.27  186.65    plot kovov podezdvka
129  751484.56 1025598.03  185.78    strom
130  751483.56 1025598.65  186.57    ze nahoe+dole
131  751482.72 1025597.73  186.95    ze nahoe
132  751481.44 1025603.13  187.47    dopravn znaka
133  751478.81 1025599.25  187.47    obruba dole
134  751478.90 1025599.54  187.48    obruba dole
135  751479.45 1025601.49  187.40    obruba dole
136  751479.60 1025602.49  187.38    obruba dole
137  751478.95 1025599.55  187.56    obruba nahoe
138  751479.25 1025600.52  187.55    obruba nahoe
139  751478.70 1025599.20  187.47    pln ra
140  751479.02 1025601.66  187.41    pln ra
141  751479.37 1025603.51  187.40    pln ra
142  751479.56 1025604.59  187.39    pln ra
143  751479.77 1025606.71  187.35    pln ra
144  751480.71 1025594.56  187.54    asfalt
145  751478.77 1025594.53  187.50    obruba dole
146  751476.10 1025594.92  187.57    osa komunikace
147  751473.96 1025595.53  187.58    pln ra
148  751473.30 1025595.57  187.58    msa dole
149  751473.42 1025602.49  187.50    msa dole
150  751473.40 1025602.50  187.64    msa nahoe
151  751473.02 1025602.55  187.63    msa nahoe
152  751473.10 1025602.54  187.63    dopravn znaka
153  751473.78 1025604.34  187.55    dopravn znaka
154  751473.34 1025600.38  187.65    msa nahoe
155  751472.95 1025600.42  187.64    msa nahoe
156  751472.96 1025600.19  187.28    msa dole
157  751472.93 1025598.15  187.27    opra nahoe
158  751472.92 1025598.15  187.05    opra nahoe
159  751472.92 1025597.94  187.05    opra nahoe
160  751472.93 1025597.95  186.61    opra nahoe
161  751472.93 1025597.66  186.61    opra nahoe
162  751472.84 1025597.63  185.67    opra dole
163  751472.83 1025598.16  185.69    opra dole
164  751472.64 1025598.33  185.65    ze dole
165  751472.79 1025598.66  185.63    ze dole
166  751472.51 1025599.65  185.99    potrub OCEL150
167  751472.55 1025599.65  185.93    potrub OCEL70
168  751472.84 1025596.98  185.66    kameny nahoe
169  751472.82 1025596.92  184.27    kameny dole
170  751472.83 1025595.63  184.14    dno
171  751472.83 1025593.29  184.22    opra dole
172  751472.58 1025593.37  184.32    kameny dole
173  751472.88 1025593.07  185.62    opra nahoe
174  751472.88 1025592.55  185.62    opra nahoe
175  751472.88 1025592.57  186.62    opra nahoe
176  751472.87 1025592.27  186.61    opra nahoe
178  751472.83 1025589.93  187.22    msa dole
179  751472.81 1025592.07  185.32    ze dole
180  751472.41 1025591.84  185.48    ze dole
181  751473.15 1025610.58  193.71    nadzemn veden
182  751465.50 1025618.33  194.32    nadzemn veden
185  751480.68 1025591.93  184.39    opra dole
186  751480.98 1025591.96  184.44    ze dole
187  751481.53 1025591.61  184.60    ze dole
189  751480.70 1025595.87  184.50    opra dole
190  751481.11 1025596.33  184.66    ze dole
191  751481.44 1025596.39  184.53    roura BE
192  751481.48 1025596.29  185.25    roura BE
193  751481.67 1025596.36  184.63    kameny dole
194  751481.85 1025595.37  184.46    kameny nahoe+dole
195  751481.73 1025595.18  184.24    beton dole
196  751483.06 1025596.80  185.44    kameny-ze
197  751481.67 1025596.32  185.29    kameny nahoe
198  751481.13 1025596.39  185.28    kameny nahoe
199  751481.06 1025594.08  184.18    dno
200  751481.52 1025592.40  184.20    beton dole
201  751481.47 1025592.37  184.41    beton nahoe
202  751481.98 1025590.76  185.11    kameny nahoe
203  751473.16 1025602.50  188.86    zbradl
204  751473.51 1025602.64  187.44    svodidla
205  751481.64 1025605.66  187.45    schody3
206  751481.67 1025606.55  187.46    schody3
207  751483.21 1025605.62  186.88    schody3
208  751480.29 1025611.93  187.47    obruba nahoe
209  751480.32 1025612.94  187.33    obruba snen
210  751480.73 1025618.93  187.31    obruba snen
211  751480.84 1025619.93  187.43    obruba nahoe
212  751477.86 1025617.58  187.34    osa komunikace
213  751475.07 1025617.38  187.30    peruovan ra
214  751474.90 1025617.30  187.30    silnice
215  751474.39 1025617.18  187.33    svodidla
216  751474.05 1025603.35  187.49    silnice
217  751474.29 1025603.34  187.50    pln ra
218  751473.96 1025617.79  187.20    ze nahoe
219  751474.50 1025617.71  187.31    msa nahoe+dole
220  751474.24 1025617.49  187.29    msa nahoe+dole
222  751473.94 1025617.81  187.14    msa dole
223  751473.50 1025618.34  187.25    msa nahoe
224  751473.56 1025618.67  187.24    msa nahoe
225  751473.56 1025618.68  187.21    msa dole
226  751470.59 1025618.85  186.96    dopravn znaka
227  751470.49 1025618.92  187.76    zbradl
228  751473.48 1025618.50  188.06    zbradl
229  751474.47 1025617.32  188.04    zbradl
230  751470.69 1025617.46  186.79    gar
231  751470.69 1025618.65  186.79    ze nahoe
232  751470.80 1025618.59  185.82    ze dole
233  751470.68 1025618.83  186.41    mostovka dole
234  751473.78 1025618.46  186.71    mostovka dole
235  751473.52 1025618.14  185.99    potrub OCEL70
236  751473.68 1025618.01  185.89    ze dole
237  751471.28 1025603.94  185.61    tern
238  751471.06 1025598.29  185.35    tern
239  751470.93 1025597.18  185.03    kameny nahoe
240  751469.32 1025597.44  185.28    ze dole
241  751469.40 1025597.47  186.71    ze nahoe
242  751467.97 1025597.41  184.26    vodoet
243  751469.27 1025597.23  184.28    ze dole
245  751469.29 1025594.33  184.21    kameny dole
246  751468.56 1025593.66  184.72    kameny nahoe
247  751453.66 1025599.76  184.19    ze dole
248  751453.68 1025599.93  186.34    ze nahoe
249  751453.20 1025598.78  184.00    dno
250  751453.00 1025597.81  184.11    beh
251  751453.06 1025599.74  185.21    potrub OCEL200
252  751485.77 1025594.76  184.20    kameny dole
253  751485.76 1025595.13  184.46    kameny nahoe
254  751493.29 1025594.45  184.67    panely nahoe
255  751493.07 1025593.72  184.30    panely dole
256  751504.55 1025591.86  184.25    kameny dole
257  751504.73 1025592.76  184.59    kameny nahoe
258  751506.83 1025592.25  184.26    kameny nahoe+dole
259  751507.92 1025593.05  184.25    kameny dole
260  751508.34 1025592.51  184.27    kameny dole
261  751507.60 1025591.64  184.24    kameny dole
262  751510.18 1025590.96  184.25    panely dole
263  751513.46 1025590.48  184.24    panely dole
264  751513.25 1025591.38  184.56    panely nahoe
265  751514.07 1025591.36  184.83    studna
266  751518.84 1025592.95  185.88    horn_hrana
267  751514.47 1025592.58  185.42    vodovod 3x
268  751510.61 1025592.42  185.08    propustek dole
269  751510.66 1025592.35  185.69    propustek nahoe
270  751510.12 1025592.55  185.69    propustek nahoe
271  751510.56 1025591.56  185.69    propustek nahoe
272  751509.25 1025591.73  185.68    propustek nahoe
273  751509.22 1025591.69  184.44    propustek dole
274  751510.58 1025591.53  184.50    propustek dole
275  751506.89 1025594.18  184.75    propustek dole
276  751506.93 1025594.20  185.68    propustek nahoe
277  751507.08 1025594.34  185.69    propustek nahoe
278  751507.09 1025594.66  185.70    propustek nahoe
279  751508.97 1025593.88  185.68    propustek nahoe
280  751518.89 1025594.91  186.04    plot drtn
281  751525.57 1025588.11  184.26    beh
282  751525.08 1025585.32  184.28    beh
283  751525.52 1025586.53  184.22    dno
284  751521.06 1025589.69  185.28    strom2X
285  751520.92 1025580.93  186.22    horn_hrana
286  751513.44 1025584.03  185.43    3Xstrom
287  751514.16 1025582.15  186.37    vodovod 3x
288  751503.02 1025584.06  186.16    horn_hrana
289  751493.69 1025585.83  186.12    budka
290  751492.44 1025585.78  186.20    budka
291  751488.61 1025584.65  186.18    strom_horn_hrana
292  751486.92 1025584.63  186.53    plot drtn_horn_hrana
293  751483.09 1025589.99  185.39    horn_hrana+doln hrana
294  751488.06 1025588.77  185.81    horn_hrana
295  751493.43 1025590.85  184.19    beh
296  751493.53 1025592.11  184.15    dno
297  751506.03 1025590.28  184.19    dno
298  751505.83 1025588.61  184.20    beh
299  751502.65 1025594.94  185.63    erpadla
300  751500.86 1025598.12  186.09    plot drtn
301  751494.47 1025595.80  185.56    strom
302  751489.50 1025597.94  185.92    strom_horn_hrana
303  751489.51 1025598.78  186.34    dlaba
304  751487.02 1025599.96  186.39    branka
305  751485.95 1025600.09  186.41    branka
306  751465.23 1025586.23  186.19    stromy
307  751467.60 1025583.02  186.21    strom
308  751465.91 1025589.53  186.21    strom_horn_hrana
309  751469.12 1025587.09  186.23    horn_hrana
310  751470.30 1025589.01  185.58    pkop
311  751455.25 1025592.31  186.18    strom_horn_hrana
312  751449.90 1025593.79  186.06    strom_horn_hrana
313  751445.92 1025594.29  185.94    strom_horn_hrana
314  751435.01 1025584.14  185.82    tern
315  751431.73 1025595.56  185.91    horn_hrana
316  751432.40 1025601.07  183.97    beh
317  751432.72 1025602.00  183.95    dno
318  751432.93 1025602.95  184.09    ze dole
319  751432.97 1025603.13  185.85    ze nahoe
320  751437.72 1025602.21  185.70    vus KAM150
321  751436.65 1025604.25  186.05    dm
322  751427.14 1025605.85  186.05    dm
323  751481.28 1025602.38  194.34    nadzemn veden
324  751481.74 1025600.93  194.38    nadzemn veden
326  751481.67 1025583.12  193.35    nadzemn veden
327  751481.64 1025568.76  194.55    nadzemn veden
328  751483.25 1025606.46  186.85    schody3
329  751484.15 1025604.90  186.82    PRIS
330  751484.29 1025605.37  186.85    branka
331  751484.32 1025606.43  186.85    plot kovov podezdvka
332  751482.98 1025610.93  187.03    stromek
333  751482.12 1025611.95  187.35    asfalt
334  751482.20 1025613.97  187.26    asfalt
335  751482.46 1025617.63  187.29    asfalt
336  751482.63 1025619.86  187.35    asfalt
337  751483.56 1025620.32  187.24    stromek
338  751484.75 1025613.65  186.89    brna
339  751484.97 1025617.17  186.90    plot kovov podezdvka
341  751470.32 1025623.95  187.75    zbradl
342  751470.42 1025617.65  187.75    zbradl
343  751469.96 1025618.78  186.88    msa nahoe
344  751470.00 1025619.04  186.87    msa nahoe
345  751469.97 1025619.06  186.79    msa dole
346  751470.44 1025623.74  186.86    msa dole
347  751470.44 1025623.75  186.95    msa nahoe
348  751470.50 1025624.03  186.94    msa nahoe
349  751471.00 1025624.00  186.85    ze nahoe
350  751471.04 1025624.00  186.05    ze dole
351  751471.68 1025623.95  186.00    obruba nahoe
352  751471.69 1025623.95  185.83    obruba dole
353  751472.60 1025623.77  185.80    panely
354  751473.64 1025623.95  185.86    obruba dole
355  751473.71 1025623.98  186.01    obruba nahoe
356  751474.01 1025623.93  185.94    ze dole
357  751473.75 1025623.51  187.23    dopravn znaka
358  751473.79 1025623.62  187.23    msa nahoe
359  751473.80 1025623.65  187.10    msa dole
360  751473.86 1025623.27  187.15    msa dole
361  751473.85 1025623.30  187.23    msa nahoe
362  751473.79 1025623.42  188.05    zbradl
363  751474.72 1025624.09  188.05    zbradl
364  751474.78 1025624.81  188.05    zbradl
365  751474.80 1025624.85  187.22    svodidla
366  751474.37 1025624.04  187.11    ze nahoe
367  751474.82 1025624.26  187.20    msa nahoe
368  751474.92 1025624.05  187.21    msa nahoe+dole
369  751475.24 1025624.22  187.24    silnice
370  751471.02 1025624.54  186.81    ze nahoe
371  751471.10 1025624.58  186.15    ze doleK
372  751474.28 1025625.66  186.65    potrub OCEL70
373  751474.20 1025625.82  186.05    potrub OCEL70
374  751474.16 1025624.79  186.25    ze dole
375  751485.34 1025623.46  186.90    brna
376  751484.61 1025635.33  187.09    stromek
377  751484.69 1025640.42  187.07    stromek
378  751476.10 1025637.79  187.24    dopravn znaka
379  751476.67 1025648.31  187.18    dopravn znaka
380  751476.86 1025648.68  187.16    silnice
381  751477.08 1025648.57  187.17    pln ra
382  751476.19 1025648.26  187.13    svodidla
383  751476.14 1025652.37  187.20    ze nahoe
384  751476.44 1025653.04  187.17    ze nahoe
385  751476.51 1025654.06  187.06    ze nahoe
386  751475.77 1025654.11  186.42    ze dole
387  751476.11 1025654.91  186.73    dopravn znaka
388  751475.17 1025651.08  185.97    obruba dole
389  751473.25 1025651.27  185.98    obruba dole
390  751474.21 1025651.27  185.91    dno
391  751473.26 1025651.84  186.19    vus PVC150
392  751472.38 1025651.72  187.15    kee
393  751476.39 1025653.60  187.08    patnk
394  751476.56 1025656.66  187.06    patnk
395  751476.30 1025650.72  187.21    svodidla
396  751479.96 1025649.40  187.20    osa komunikace
397  751482.81 1025649.36  187.10    obruba snen
398  751482.78 1025648.34  187.26    obruba nahoe
399  751484.18 1025644.88  187.26    asfalt
400  751484.09 1025645.85  187.30    asfalt
401  751485.22 1025645.66  187.32    asfalt
402  751485.75 1025649.14  187.25    asfalt
403  751484.36 1025649.24  187.21    asfalt
404  751484.53 1025659.67  186.97    asfalt
405  751483.47 1025659.76  186.99    silnice
406  751483.69 1025659.26  186.90    vpus
407  751483.76 1025659.73  186.89    lab500
408  751482.11 1025655.42  187.14    kanalizan achta
409  751487.97 1025660.95  187.16    dm
410  751488.11 1025658.09  187.00    cesta
411  751486.45 1025650.39  187.13    cesta
412  751486.77 1025647.84  187.27    plot drtn_prodl.80cm
413  751478.23 1025675.82  187.19    pln ra
414  751478.02 1025676.32  187.19    silnice
415  751477.09 1025658.34  187.13    silnice
416  751477.18 1025656.38  187.14    silnice
417  751477.39 1025656.31  187.14    pln ra
418  751477.68 1025664.54  187.14    pln ra
419  751477.57 1025676.34  187.13    horn_hrana
420  751476.44 1025676.31  186.13    obruba dole
421  751474.48 1025676.55  186.12    obruba dole
422  751475.45 1025676.41  186.10    dno
423  751473.04 1025676.42  187.34    kee
424  751481.52 1025675.80  187.17    osa komunikace
425  751484.43 1025675.63  187.07    peruovan ra
426  751485.61 1025669.43  187.11    kovov sloup+lampa
427  751486.00 1025670.71  187.16    dm
428  751484.42 1025669.60  186.92    lab500
429  751484.74 1025672.33  186.96    lab500
430  751485.47 1025675.30  186.99    lab500
431  751486.42 1025675.25  187.24    ze
432  751484.12 1025669.96  187.02    silnice
433  751484.64 1025673.40  187.05    silnice
434  751485.06 1025675.43  187.05    obruba snen
435  751485.84 1025677.33  187.07    obruba snen
436  751487.15 1025678.63  187.05    obruba snen
437  751484.13 1025678.77  187.13    kanalizan achta
438  751486.30 1025684.97  187.02    oup vodovod
439  751487.60 1025687.69  187.25    obruba nahoe
440  751487.59 1025687.64  187.10    obruba dole
441  751485.98 1025688.88  187.12    obruba dole
442  751485.57 1025690.39  187.11    obruba dole
443  751485.40 1025690.03  187.11    pln ra
444  751489.09 1025688.72  187.21    dm
445  751488.02 1025701.75  187.22    dm
446  751486.23 1025700.37  187.17    obruba dole
447  751486.11 1025700.38  187.17    pln ra
448  751482.80 1025700.77  187.30    osa komunikace
449  751479.62 1025700.91  187.32    pln ra
450  751479.27 1025700.94  187.31    silnice
451  751478.84 1025700.94  187.25    horn_hrana
452  751477.76 1025701.08  186.43    obruba nahoe
453  751477.72 1025701.07  186.28    obruba dole
454  751475.75 1025701.30  186.29    obruba dole
455  751475.70 1025701.30  186.46    obruba nahoe
456  751476.75 1025701.25  186.24    dno
457  751474.48 1025700.99  187.27    kee
458  751451.52 1025580.15  186.05    tern